Belknap Bridge

Painting Belknap BridgeRAINBOW: The Belknap covered Bridge will be closed from August 15th to November 17th for rehabilitation work. The project includes replacing some of the structural elements of the truss as well as replacing the floor decking. The exterior will receive a new coat of paint as well.
In addition, the $830,475 project also involves adding lights down the middle of the bridge (inside) to increase safety, especially for pedestrians. Workers from  Oregon Woods, Inc. will be adding “post tensioning” along the bottom, which helps strengthen the structure.
During the project motorists can take a detour route from McKenzie River Drive to Highway 126, to Cougar Dam Road and then to West King Road. The project is funded in part by two federal programs: the National Historic Covered Bridge Preservation Project and the Highway Bridge Fund.

Image: Prior rehabilitation included repainting the bridge in 2003.

Bridge reconstruction mapRAINBOW: Local drivers will need to change their normal routes next year due to restoration work scheduled for the Belknap Covered Bridåçge. Theå Lane County Board of Commissioners was scheduled to approve a work schedule this week calling for preservation work to occur from April through September of 2015.
According to Lane County Public Works, the proposed closure is in the public interest so that the bridge rehabilitation work can be done safely and more efficiently.



McKenzie River Reflections is the weekly newspaper serving Oregon's McKenzie River Valley. Available by mail for $23/yr in Lane County, $29/yr outside Lane. Digital subscriptions are $23/yr. Subscribe at: Purchase copies online at: Read about area communities including Cedar Flat, Walterville, Camp Creek, Leaburg, Vida, Nimrod, Finn Rock, Blue River, Rainbow and McKenzie Bridge.