road closure

RAINBOW: West King Road will be closed from July 24th to July 30th during the Belknap Covered Bridge rehabilitation construction project, which will include a new roof. There will also be bridge work before and after the week of July 24th, with traffic controlled by flaggers.   
The West King Road closure are extends from milepost 0.000 to milepost 0.078. The road and bridge will be closed from 8 a.m. on Monday, July 24th, until 5 p.m. on Sunday, July 30th.

Painting Belknap BridgeRAINBOW: The Belknap covered Bridge will be closed from August 15th to November 17th for rehabilitation work. The project includes replacing some of the structural elements of the truss as well as replacing the floor decking. The exterior will receive a new coat of paint as well.
In addition, the $830,475 project also involves adding lights down the middle of the bridge (inside) to increase safety, especially for pedestrians. Workers from  Oregon Woods, Inc. will be adding “post tensioning” along the bottom, which helps strengthen the structure.
During the project motorists can take a detour route from McKenzie River Drive to Highway 126, to Cougar Dam Road and then to West King Road. The project is funded in part by two federal programs: the National Historic Covered Bridge Preservation Project and the Highway Bridge Fund.

Image: Prior rehabilitation included repainting the bridge in 2003.

McKenzie River Reflections is the weekly newspaper serving Oregon's McKenzie River Valley. Available by mail for $23/yr in Lane County, $29/yr outside Lane. Digital subscriptions are $23/yr. Subscribe at: http://mckenzieriverreflectionsnewspaper.com/catalog/subscriptions-0. Purchase copies online at: http://mckenzieriverreflectionsnewspaper.com/catalog/back-issues-0. Read about area communities including Cedar Flat, Walterville, Camp Creek, Leaburg, Vida, Nimrod, Finn Rock, Blue River, Rainbow and McKenzie Bridge.